TOP SIDE DIESEL GENERATOR
Portsmouth Naval Shipyard in Kittery, Maine needs to rent and service a topside diesel docking generator for 10 weeks (6-week base + 4-week option).
Rental and on-site service of a topside diesel docking generator for shipyard operations, including delivery, setup, maintenance, and removal for the 6-week base period (12/24/2026–02/03/2027) with optional extension of 4 weeks (02/04/2027–03/03/2027).
- [], "Must hold required licenses for generator operation and maintenance in Maine", "Must carry adequate liability and equipment insurance", "Ability to deliver and install at Portsmouth Naval Shipyard within shipyard safety/access requirements"
| Solicitation # | N394026Q3129 |
| Notice type | Combined Synopsis/Solicitation |
| NAICS | 532490 |
| Set-aside | Total Small Business Set-Aside (FAR 19.5) |
| Place of performance | Kittery, ME |
| Response deadline | 2026-06-10 15:00 |
| Posted | 2026-06-04 |
Don't just find it — prepare it.
Get a go/no-go call, a full compliance checklist, your bid-package outline, and a tailored first draft for this exact solicitation — built from the full package and your company profile.
Bid Assist plan required · we'll email your finished deliverable in a couple of minutes.
Want bids like this in your inbox?
BidQuill alerts you the moment a matching NAICS 532490 opportunity posts — briefed, not buried.
Get free alerts